RESIDENTIAL


416 Kent.jpg

416-420 KENT

Brooklyn, NY

This unique project located along the East river featured very challenging cantilevered protrusions randomly located throughout both projects. These features required tall shoring over 70’, capable of supporting multiple levels until the building was complete. TITAN’s engineering group deployed the TITAN MAX 20K shoring system to accommodate the tall shoring/high capacity areas. The TITAN HV modular shoring system was used through the building because of its flexibility and efficiency. 

784,465

Square Feet

22

Levels

HV, MAX, OP

Equipment Used


Smart House.jpg

SMART HOUSE

Toronto, ON

This remarkable structure located in Toronto’s financial district featured twisted/rotated floor plates in the tower supported by a massive 4’ thick transfer slab at the 5th floor further supported by 4 commercial levels and “corkscrew” style underground parking below. TITAN’s engineering group designed the lower levels with the TITAN HV shoring system to meet the challenges of the two-way sloped parking areas and complicated commercial floors. The transfer slab was shored using TITAN’s Alu 11K shoring frames in conjunction with TITAN’s XL350’s reshores

272,400

Square Feet

26

Levels

HV, OP

Equipment Used


Purves St.jpg

44-26 PURVES

Long Island City, NY

Placeholder text for description of complexity of building. Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler

 

307,000

Square Feet

25

Levels

HV, OP

Equipment Used


Hanover BLVD Place.jpg

HANOVER BLVD PLACE

Houston, TX

Placeholder text for description of complexity of building. Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler

 

507,273

Square Feet

33

Levels

HV

Equipment Used


1134 Fulton.jpg

1134 FULTON

Brooklyn, NY

Placeholder text for description of complexity of building. Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler

 

204,910

Square Feet

10

Levels

HV, OP

Equipment Used


Ballston Quarter.jpg

BALLSTON QUARTER

Arlington, VA

Placeholder text for description of complexity of building. Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler

 

615,289

Square Feet

22

Levels

HV, XL

Equipment Used


9 Tippett.jpg

9 TIPPETT

North York, ON

Placeholder text for description of complexity of building. Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler text Filler

 

963,996

Square Feet

17

Levels

HV

Equipment Used


123 Melrose.jpg

123 MELROSE & 54 NOLL

Brooklyn, NY

This sprawling project in Brooklyn featured architectural angled columns at the perimeter causing floor to floor shoring variations and unique shoring conditions that were easily and safely accommodated by the TITAN HV modular shoring system, allowing the contractor to meet the aggressive schedule.

 

1,043,150

Square Feet

9

Levels

HV, OP

Equipment Used